{"id":4713,"date":"2025-12-02T08:00:00","date_gmt":"2025-12-02T00:00:00","guid":{"rendered":"https:\/\/www.topfastpcb.com\/?p=4713"},"modified":"2025-12-01T19:52:03","modified_gmt":"2025-12-01T11:52:03","slug":"pcb-design-drc-inspection-complete-guide","status":"publish","type":"post","link":"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/","title":{"rendered":"PCB Tasar\u0131m\u0131 DRC Denetimi Eksiksiz K\u0131lavuz: 90% \u00dcretim Tuzaklar\u0131ndan Ka\u00e7\u0131n\u0131n"},"content":{"rendered":"<p>Tasar\u0131m Kural\u0131 Kontrol\u00fc (DRC) bir <strong>vazge\u00e7i\u0307lmez kali\u0307te kontrol<\/strong> PCB tasar\u0131m s\u00fcrecindeki ba\u011flant\u0131. Tasar\u0131m\u0131n \"ba\u011f\u0131\u015f\u0131kl\u0131k sistemi\" gibi hareket eder ve yerle\u015fim a\u015famas\u0131nda \u00fcretim hatalar\u0131na, sinyal b\u00fct\u00fcnl\u00fc\u011f\u00fc sorunlar\u0131na ve g\u00fcvenilirlik risklerine yol a\u00e7abilecek tasar\u0131m hatalar\u0131n\u0131 belirleyip \u00f6nleyebilir.<\/p><blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p><strong>Profesyonel \u0130\u00e7g\u00f6r\u00fc:<\/strong> <a href=\"https:\/\/www.topfastpcb.com\/tr\/contact\/\">TOPFAST<\/a> \u00dcretim verileri, sistematik DRC denetimi uygulayan projelerin prototip yinelemelerini ortalama \u015fu kadar azaltt\u0131\u011f\u0131n\u0131 g\u00f6stermektedir <strong>2,3 kat<\/strong>yakla\u015f\u0131k olarak tasarruf sa\u011flar <strong>$8,500<\/strong> \u00fcretim maliyetlerinde.<\/p><\/blockquote><p>Yayg\u0131n yanl\u0131\u015f anlamalar\u0131n aksine, DRC sadece bir \"aral\u0131k kontrol\u00fc\" de\u011fildir - kapsaml\u0131 bir do\u011frulama sistemidir. <strong>elektriksel k\u0131s\u0131tlamalar, fiziksel s\u0131n\u0131rlamalar, \u00fcretim gereksinimleri, montaj ko\u015fullar\u0131 ve sinyal b\u00fct\u00fcnl\u00fc\u011f\u00fc<\/strong>.<\/p><div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"402\" src=\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-1.jpg\" alt=\"PCB Tasar\u0131m DRC\" class=\"wp-image-4716\" srcset=\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-1.jpg 600w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-1-300x201.jpg 300w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-1-18x12.jpg 18w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure><\/div><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_74 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u0130\u00e7indekiler<\/p>\n<span class=\"ez-toc-title-toggle\"><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Which_DRC_Problem_Are_You_Facing\" >Hangi DRC Sorunuyla Kar\u015f\u0131 Kar\u015f\u0131yas\u0131n\u0131z?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Why_Is_DRC_Inspection_So_Critical\" >DRC Denetimi Neden Bu Kadar Kritik?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#1_Avoid_Expensive_Manufacturing_Rework\" >1. Pahal\u0131 \u00dcretim Rework'lerinden Ka\u00e7\u0131n\u0131n<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#2_Ensure_First-Time_Board_Success_Rate\" >2. \u0130lk Kez Kurul Ba\u015far\u0131 Oran\u0131n\u0131 Sa\u011flay\u0131n<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#3_Signal_Integrity_Assurance\" >3.Sinyal B\u00fct\u00fcnl\u00fc\u011f\u00fc G\u00fcvencesi<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#4_Compliance_Assurance\" >4. Uyumluluk G\u00fcvencesi<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#5_Seamless_Design-to-Manufacturing_Transition\" >5. Tasar\u0131mdan \u0130malata Sorunsuz Ge\u00e7i\u015f<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#KiCad_8_DRC_Practical_Guide_Professional-Level_Inspection_with_Open-Source_Tools\" >KiCad 8 DRC Pratik K\u0131lavuzu: A\u00e7\u0131k Kaynak Ara\u00e7larla Profesyonel D\u00fczeyde Denetim<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Quick_Configuration_Guide_5-Minute_Setup\" >H\u0131zl\u0131 Yap\u0131land\u0131rma K\u0131lavuzu (5 Dakikal\u0131k Kurulum)<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#1_Core_Rule_Configuration_Table\" >1. \u00c7ekirdek Kural Yap\u0131land\u0131rma Tablosu<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#2_Net_Class_Strategy\" >2. Net S\u0131n\u0131f Stratejisi<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#3_Teardrop_Optimisation_Configuration\" >3. G\u00f6zya\u015f\u0131 Damlas\u0131 Optimizasyon Konfig\u00fcrasyonu<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Common_KiCad_DRC_Pitfalls\" >Yayg\u0131n KiCad DRC Tuzaklar\u0131<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Altium_Designer_Enterprise-Grade_DRC_Solution\" >Altium Designer: Kurumsal Seviyede DRC \u00c7\u00f6z\u00fcm\u00fc<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Dual-Mode_Inspection_Strategy\" >\u00c7ift Modlu Denetim Stratejisi<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Altium_Rule_System_Comparison_Chart\" >Altium Kural Sistemi Kar\u015f\u0131la\u015ft\u0131rma Tablosu<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Advanced_Configuration_Techniques\" >Geli\u015fmi\u015f Yap\u0131land\u0131rma Teknikleri<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#1_Conditional_Rule_Settings\" >1. Ko\u015fullu Kural Ayarlar\u0131<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#2_Region_Rule_Override\" >2. B\u00f6lge Kural\u0131 Ge\u00e7ersiz K\u0131lma<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#3_TOPFAST_Manufacturing_Rule_Import\" >3. TOPFAST \u00dcretim Kural\u0131 \u0130thalat\u0131<\/a><\/li><\/ul><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Cadence_Allegro_Industrial_Standard_for_Complex_Designs\" >Cadence Allegro: Karma\u015f\u0131k Tasar\u0131mlar i\u00e7in End\u00fcstriyel Standart<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Three-Layer_Constraint_Management_System\" >\u00dc\u00e7 Katmanl\u0131 K\u0131s\u0131t Y\u00f6netim Sistemi<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#1_Spacing_Constraint_Matrix_Unit_mil\" >1. Aral\u0131k K\u0131s\u0131tlama Matrisi (Birim: mil)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#2_Physical_Constraint_Setup_Guide\" >2. Fiziksel K\u0131s\u0131t Kurulum K\u0131lavuzu<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#3_Electrical_Constraint_Configuration\" >3. Elektriksel K\u0131s\u0131t Konfig\u00fcrasyonu<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Allegro_DRC_Workflow\" >Allegro DRC \u0130\u015f Ak\u0131\u015f\u0131<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Capability_Comparison_of_Three_Tools\" >\u00dc\u00e7 Arac\u0131n Yetenek Kar\u015f\u0131la\u015ft\u0131rmas\u0131<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#DRC_and_DFM_Collaboration_Beyond_Basic_Checks\" >DRC ve DFM \u0130\u015fbirli\u011fi: Temel Kontrollerin \u00d6tesinde<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Complete_Workflow_From_Design_to_Manufacturing\" >Eksiksiz \u0130\u015f Ak\u0131\u015f\u0131: Tasar\u0131mdan \u00dcretime<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#DRCDFM_Joint_Inspection_Checklist\" >DRC+DFM Ortak Denetim Kontrol Listesi<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-31\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Basic_Manufacturing_Checks_TOPFAST_Recommendations\" >Temel \u00dcretim Kontrolleri (TOPFAST Tavsiyeleri)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-32\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Advanced_Manufacturing_Checks\" >Geli\u015fmi\u015f \u00dcretim Kontrolleri<\/a><\/li><\/ul><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-33\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Common_DRC_Problems_and_Solutions\" >Yayg\u0131n DRC Sorunlar\u0131 ve \u00c7\u00f6z\u00fcmleri<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-34\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#TOPFAST_Engineer_Practical_Case_Library\" >TOPFAST M\u00fchendis Pratik Vaka K\u00fct\u00fcphanesi<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-35\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Case_1_False_Short-Circuit_Alarms\" >Vaka 1: Yanl\u0131\u015f K\u0131sa Devre Alarmlar\u0131<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-36\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Case_2_Impedance_Matching_Failure\" >Vaka 2: Empedans E\u015fle\u015ftirme Hatas\u0131<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-37\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Case_3_Manufacturing_Rule_Conflicts\" >Vaka 3: \u00dcretim Kural\u0131 \u00c7at\u0131\u015fmalar\u0131<\/a><\/li><\/ul><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-38\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#TOPFAST_Customer_Success_Cases\" >TOPFAST M\u00fc\u015fteri Ba\u015far\u0131 \u00d6rnekleri<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-39\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Case_Industrial_Control_Motherboard\" >Kasa: End\u00fcstriyel Kontrol Anakart\u0131<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-40\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Conclusion_Master_DRC_Master_the_Key_to_Success\" >Sonu\u00e7: DRC'de Ustala\u015f\u0131n, Ba\u015far\u0131n\u0131n Anahtar\u0131nda Ustala\u015f\u0131n<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-41\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Key_Action_Steps\" >\u00d6nemli Eylem Ad\u0131mlar\u0131<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-42\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Immediate_Actions_Complete_Today\" >Acil Eylemler (Bug\u00fcn Tamamlay\u0131n)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-43\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Short-term_Optimisation_Complete_This_Week\" >K\u0131sa Vadeli Optimizasyon (Bu Hafta Tamamlanacak)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-44\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Long-term_Strategy_Complete_This_Month\" >Uzun Vadeli Strateji (Bu Ay Tamamlay\u0131n)<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-45\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Professional_Advice\" >Profesyonel Tavsiye<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-46\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Expert_Q_A\" >Uzman Soru-Cevap<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-47\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#Get_Professional_Support\" >Profesyonel Destek Al\u0131n<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-48\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/#TOPFAST_Technical_Services\" >TOPFAST Teknik Hizmetler<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Which_DRC_Problem_Are_You_Facing\"><\/span>Hangi DRC Sorunuyla Kar\u015f\u0131 Kar\u015f\u0131yas\u0131n\u0131z?<span class=\"ez-toc-section-end\"><\/span><\/h2><ul class=\"wp-block-list\"><li>Yanl\u0131\u015f k\u0131sa devre alarmlar\u0131<\/li>\n\n<li>Aral\u0131k kural\u0131 \u00e7ak\u0131\u015fmalar\u0131<\/li>\n\n<li>Empedans e\u015fle\u015ftirme zorluklar\u0131<\/li>\n\n<li>Belirsiz \u00fcretim kurallar\u0131<\/li>\n\n<li>Alet kullan\u0131m\u0131na a\u015fina olmama<\/li><\/ul><p><strong>TOPFAST m\u00fchendislerinden 24 saat i\u00e7inde profesyonel bir yan\u0131t almak i\u00e7in sorunuzu hemen g\u00f6nderin.<\/strong><\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_Is_DRC_Inspection_So_Critical\"><\/span>DRC Denetimi Neden Bu Kadar Kritik? <span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Avoid_Expensive_Manufacturing_Rework\"><\/span>1. Pahal\u0131 \u00dcretim Rework'lerinden Ka\u00e7\u0131n\u0131n<span class=\"ez-toc-section-end\"><\/span><\/h3><p><strong>Veriler Konu\u015fuyor:<\/strong> Tasar\u0131m a\u015famas\u0131ndaki kusurlar\u0131 d\u00fczeltmenin maliyeti sadece <strong>1\/100<\/strong> \u00fcretim a\u015famas\u0131nda.<\/p><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>D\u00fczeltme A\u015famas\u0131<\/th><th>Ortalama Maliyet<\/th><th>Zaman Etkisi<\/th><\/tr><\/thead><tbody><tr><td>Tasar\u0131m A\u015famas\u0131<\/td><td>$50-200<\/td><td>2-4 saat<\/td><\/tr><tr><td>Prototip A\u015famas\u0131<\/td><td>$2,000-5,000<\/td><td>2-4 hafta<\/td><\/tr><tr><td>Seri \u00dcretim A\u015famas\u0131<\/td><td>$10,000+<\/td><td>4-8 hafta<\/td><\/tr><\/tbody><\/table><\/figure><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Ensure_First-Time_Board_Success_Rate\"><\/span>2. \u0130lk Kez Kurul Ba\u015far\u0131 Oran\u0131n\u0131 Sa\u011flay\u0131n<span class=\"ez-toc-section-end\"><\/span><\/h3><p>TOPFAST istatistikleri g\u00f6steriyor: Tam DRC incelemesini tamamlayan tasar\u0131mlar\u0131n ilk kez kurul ba\u015far\u0131 oranlar\u0131 <strong>58%<\/strong> i\u00e7in <strong>92%<\/strong>.<\/p><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Signal_Integrity_Assurance\"><\/span>3.Sinyal B\u00fct\u00fcnl\u00fc\u011f\u00fc G\u00fcvencesi<span class=\"ez-toc-section-end\"><\/span><\/h3><p>Uygun DRC ayarlar\u0131 azaltabilir:<\/p><ul class=\"wp-block-list\"><li>\u00c7apraz konu\u015fma riski: <strong>70% azaltma<\/strong><\/li>\n\n<li>EMI sorunlar\u0131: <strong>65% azaltma<\/strong><\/li>\n\n<li>Empedans uyu\u015fmazl\u0131\u011f\u0131: <strong>90% ka\u00e7\u0131n\u0131ld\u0131<\/strong><\/li><\/ul><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_Compliance_Assurance\"><\/span>4. Uyumluluk G\u00fcvencesi<span class=\"ez-toc-section-end\"><\/span><\/h3><p>End\u00fcstri standartlar\u0131n\u0131n uygulanmas\u0131:<\/p><ul class=\"wp-block-list\"><li><strong>IPC-6012:<\/strong> Sert PCB Performans \u00d6zellikleri<\/li>\n\n<li><strong>IPC-2221:<\/strong> PCB Tasar\u0131m\u0131 i\u00e7in Genel Standart<\/li>\n\n<li><strong>IEC-61191:<\/strong> Elektronik Montaj Gereksinimleri<\/li><\/ul><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5_Seamless_Design-to-Manufacturing_Transition\"><\/span>5. Tasar\u0131mdan \u0130malata Sorunsuz Ge\u00e7i\u015f<span class=\"ez-toc-section-end\"><\/span><\/h3><p>Gibi profesyonel \u00fcreticilere \"\u00fcretime haz\u0131r\" tasar\u0131mlar sa\u011flamak <strong>TOPFAST<\/strong> teknik ileti\u015fim d\u00f6ng\u00fclerini \u015fu \u015fekilde azalt\u0131r <strong>50%<\/strong>.<\/p><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"KiCad_8_DRC_Practical_Guide_Professional-Level_Inspection_with_Open-Source_Tools\"><\/span>KiCad 8 DRC Pratik K\u0131lavuzu: A\u00e7\u0131k Kaynak Ara\u00e7larla Profesyonel D\u00fczeyde Denetim<span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Quick_Configuration_Guide_5-Minute_Setup\"><\/span>H\u0131zl\u0131 Yap\u0131land\u0131rma K\u0131lavuzu (5 Dakikal\u0131k Kurulum)<span class=\"ez-toc-section-end\"><\/span><\/h3><pre class=\"wp-block-code\"><code>\u00c7al\u0131\u015fma Yolu: Dosya \u2192 Kart Kurulumu \u2192 Tasar\u0131m Kurallar\u0131<\/code><\/pre><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Core_Rule_Configuration_Table\"><\/span>1. \u00c7ekirdek Kural Yap\u0131land\u0131rma Tablosu<span class=\"ez-toc-section-end\"><\/span><\/h4><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Kural Kategorisi<\/th><th>\u00d6nerilen De\u011fer<\/th><th>Notlar<\/th><\/tr><\/thead><tbody><tr><td><strong>Minimum A\u00e7\u0131kl\u0131k<\/strong><\/td><td>0.15mm<\/td><td>TOPFAST \u00fcretim kapasitesi temel \u00e7izgisi<\/td><\/tr><tr><td><strong>\u0130z Geni\u015fli\u011fi Aral\u0131\u011f\u0131<\/strong><\/td><td>0,15-0,5 mm<\/td><td>G\u00fc\u00e7 izleri \u22650,3 mm \u00f6nerilir<\/td><\/tr><tr><td><strong>Matkap Boyutu<\/strong><\/td><td>\u22650,2 mm<\/td><td>Mekanik delme limiti<\/td><\/tr><tr><td><strong>Dairesel Halka<\/strong><\/td><td>\u22650,1 mm<\/td><td>IPC S\u0131n\u0131f 2 gereksinimi<\/td><\/tr><\/tbody><\/table><\/figure><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Net_Class_Strategy\"><\/span>2. Net S\u0131n\u0131f Stratejisi<span class=\"ez-toc-section-end\"><\/span><\/h4><pre class=\"wp-block-code\"><code>G\u00fc\u00e7 A\u011flar\u0131: \u0130z geni\u015fli\u011fi 0,3 mm, bo\u015fluk 0,2 mm\nY\u00fcksek H\u0131zl\u0131 Sinyaller: \u0130z geni\u015fli\u011fi 0,15 mm, a\u00e7\u0131kl\u0131k 0,15 mm\nDiferansiyel \u00c7iftler: Empedans kontrol\u00fc, uzunluk e\u015fle\u015ftirme<\/code><\/pre><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Teardrop_Optimisation_Configuration\"><\/span>3. G\u00f6zya\u015f\u0131 Damlas\u0131 Optimizasyon Konfig\u00fcrasyonu<span class=\"ez-toc-section-end\"><\/span><\/h4><pre class=\"wp-block-code\"><code>Tip Dairesel g\u00f6zya\u015f\u0131 damlalar\u0131\nUzunluk Oran\u0131: 0,25\nGeni\u015flik Oran\u0131: 0.25\nUygulama Kapsam\u0131: T\u00fcm delikli pedler<\/code><\/pre><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Common_KiCad_DRC_Pitfalls\"><\/span>Yayg\u0131n KiCad DRC Tuzaklar\u0131<span class=\"ez-toc-section-end\"><\/span><\/h3><ul class=\"wp-block-list\"><li><strong>Yanl\u0131\u015f Hatalar:<\/strong> Bak\u0131r b\u00f6lgeler g\u00fcncellenmedi (\"T\u00fcm b\u00f6lgeleri yeniden doldur\" se\u00e7ene\u011fini etkinle\u015ftirin)<\/li>\n\n<li><strong>Ka\u00e7\u0131r\u0131lan \u00c7ekler:<\/strong> \u015eematik-PCB tutarl\u0131l\u0131\u011f\u0131 do\u011frulanmad\u0131 (\u0130lgili se\u00e7ene\u011fi kontrol edin)<\/li>\n\n<li><strong>Kural \u00c7at\u0131\u015fmalar\u0131:<\/strong> Birden fazla a\u011f s\u0131n\u0131f\u0131 kural\u0131 \u00e7ak\u0131\u015f\u0131yor (\u00d6ncelikleri ayarlay\u0131n)<\/li><\/ul><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Altium_Designer_Enterprise-Grade_DRC_Solution\"><\/span>Altium Designer: Kurumsal Seviyede DRC \u00c7\u00f6z\u00fcm\u00fc<span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Dual-Mode_Inspection_Strategy\"><\/span>\u00c7ift Modlu Denetim Stratejisi<span class=\"ez-toc-section-end\"><\/span><\/h3><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Denetim Modu<\/th><th>Tetikleme Zamanlamas\u0131<\/th><th>Avantajlar 2025<\/th><th>Uygun Senaryolar<\/th><\/tr><\/thead><tbody><tr><td><strong>\u00c7evrimi\u00e7i DRC<\/strong><\/td><td>Tasar\u0131m s\u0131ras\u0131nda ger\u00e7ek zamanl\u0131<\/td><td>An\u0131nda geri bildirim<\/td><td>Yerle\u015fim ve y\u00f6nlendirme a\u015famas\u0131<\/td><\/tr><tr><td><strong>Toplu DRC<\/strong><\/td><td>Manuel tetik<\/td><td>Kapsaml\u0131 ve eksiksiz<\/td><td>Tasar\u0131m tamamland\u0131ktan sonra<\/td><\/tr><\/tbody><\/table><\/figure><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Altium_Rule_System_Comparison_Chart\"><\/span>Altium Kural Sistemi Kar\u015f\u0131la\u015ft\u0131rma Tablosu<span class=\"ez-toc-section-end\"><\/span><\/h3><div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"106\" src=\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/Altium-Rule-System-Comparison-Chart-1024x106.png\" alt=\"Altium Kural Sistemi Kar\u015f\u0131la\u015ft\u0131rma Tablosu\" class=\"wp-image-4714\" style=\"width:800px\" srcset=\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/Altium-Rule-System-Comparison-Chart-1024x106.png 1024w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/Altium-Rule-System-Comparison-Chart-300x31.png 300w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/Altium-Rule-System-Comparison-Chart-768x79.png 768w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/Altium-Rule-System-Comparison-Chart-1536x158.png 1536w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/Altium-Rule-System-Comparison-Chart-2048x211.png 2048w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/Altium-Rule-System-Comparison-Chart-18x2.png 18w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/Altium-Rule-System-Comparison-Chart-600x62.png 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Advanced_Configuration_Techniques\"><\/span>Geli\u015fmi\u015f Yap\u0131land\u0131rma Teknikleri<span class=\"ez-toc-section-end\"><\/span><\/h3><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Conditional_Rule_Settings\"><\/span>1. Ko\u015fullu Kural Ayarlar\u0131<span class=\"ez-toc-section-end\"><\/span><\/h4><pre class=\"wp-block-code\"><code>Durum: A\u011f ad\u0131 \"PWR\" i\u00e7eriyor\nKural: \u0130z geni\u015fli\u011fi \u22650,4 mm, bo\u015fluk \u22650,25 mm\n\u00d6ncelik: Y\u00fcksek<\/code><\/pre><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Region_Rule_Override\"><\/span>2. B\u00f6lge Kural\u0131 Ge\u00e7ersiz K\u0131lma<span class=\"ez-toc-section-end\"><\/span><\/h4><pre class=\"wp-block-code\"><code>B\u00f6lge: BGA paketinin alt\u0131nda\nKural: \u0130z geni\u015fli\u011fi 0,1 mm, bo\u015fluk 0,1 mm\nGe\u00e7ersiz k\u0131lma: K\u00fcresel kurallar<\/code><\/pre><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_TOPFAST_Manufacturing_Rule_Import\"><\/span>3. TOPFAST \u00dcretim Kural\u0131 \u0130thalat\u0131<span class=\"ez-toc-section-end\"><\/span><\/h4><pre class=\"wp-block-code\"><code>Dosyay\u0131 i\u00e7e aktar\u0131n: TOPFAST_Altium_DRC.RUL\n\u0130\u00e7erir: 60+ \u00fcretim k\u0131s\u0131tlamas\u0131\nG\u00fcncelleme s\u0131kl\u0131\u011f\u0131: \u00dc\u00e7 ayda bir<\/code><\/pre><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Cadence_Allegro_Industrial_Standard_for_Complex_Designs\"><\/span>Cadence Allegro: Karma\u015f\u0131k Tasar\u0131mlar i\u00e7in End\u00fcstriyel Standart<span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Three-Layer_Constraint_Management_System\"><\/span>\u00dc\u00e7 Katmanl\u0131 K\u0131s\u0131t Y\u00f6netim Sistemi<span class=\"ez-toc-section-end\"><\/span><\/h3><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Spacing_Constraint_Matrix_Unit_mil\"><\/span>1. Aral\u0131k K\u0131s\u0131tlama Matrisi (Birim: mil)<span class=\"ez-toc-section-end\"><\/span><\/h4><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>\u00d6\u011fe T\u00fcr\u00fc<\/th><th>\u0130z-Takip<\/th><th>Trace-Pad<\/th><th>Pad-Pad<\/th><th>Via-Via<\/th><\/tr><\/thead><tbody><tr><td><strong>Varsay\u0131lan De\u011fer<\/strong><\/td><td>5<\/td><td>6<\/td><td>7<\/td><td>8<\/td><\/tr><tr><td><strong>G\u00fc\u00e7 A\u011flar\u0131<\/strong><\/td><td>8<\/td><td>10<\/td><td>12<\/td><td>10<\/td><\/tr><tr><td><strong>Y\u00fcksek H\u0131zl\u0131 Sinyaller<\/strong><\/td><td>6<\/td><td>7<\/td><td>8<\/td><td>8<\/td><\/tr><tr><td><strong>BGA Alan\u0131<\/strong><\/td><td>4<\/td><td>5<\/td><td>6<\/td><td>6<\/td><\/tr><\/tbody><\/table><\/figure><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Physical_Constraint_Setup_Guide\"><\/span>2. Fiziksel K\u0131s\u0131t Kurulum K\u0131lavuzu<span class=\"ez-toc-section-end\"><\/span><\/h4><pre class=\"wp-block-code\"><code>\u0130z geni\u015fli\u011fi aral\u0131\u011f\u0131: 3-20mil (i\u00e7 katmanlar), 4-25mil (d\u0131\u015f katmanlar)\nYol se\u00e7imi: Tercih edilen 8\/16mil vialar\nKatman atamas\u0131: \u0130\u00e7 katmanlarda y\u00fcksek h\u0131zl\u0131 sinyaller, d\u0131\u015f katmanlarda g\u00fc\u00e7<\/code><\/pre><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Electrical_Constraint_Configuration\"><\/span>3. Elektriksel K\u0131s\u0131t Konfig\u00fcrasyonu<span class=\"ez-toc-section-end\"><\/span><\/h4><pre class=\"wp-block-code\"><code>Yay\u0131lma gecikmesi: &lt; 1ns\/in\u00e7\nBa\u011f\u0131l gecikme: \u00b15ps\nEmpedans kontrol\u00fc: 50\u03a9\u00b110%\nDiferansiyel \u00e7iftler: 100\u03a9\u00b110%<\/code><\/pre><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Allegro_DRC_Workflow\"><\/span>Allegro DRC \u0130\u015f Ak\u0131\u015f\u0131<span class=\"ez-toc-section-end\"><\/span><\/h3><pre class=\"wp-block-code\"><code>1. Kurulum \u2192 K\u0131s\u0131tlamalar \u2192 Modlar (T\u00fcm kurallar\u0131 etkinle\u015ftir)\n2. Aral\u0131k\/fiziksel\/elektriksel k\u0131s\u0131tlama de\u011ferlerini yap\u0131land\u0131r\u0131n\n3. Ekran \u2192 Durum \u2192 DRC'yi G\u00fcncelle\n4. D\u0131\u015fa Aktar \u2192 H\u0131zl\u0131 Raporlar \u2192 Tasar\u0131m Kurallar\u0131 Kontrol\u00fc\n5. Raporu analiz edin, ihlalleri d\u00fczeltin<\/code><\/pre><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Capability_Comparison_of_Three_Tools\"><\/span>\u00dc\u00e7 Arac\u0131n Yetenek Kar\u015f\u0131la\u015ft\u0131rmas\u0131<span class=\"ez-toc-section-end\"><\/span><\/h2><figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>\u00d6zellik<\/th><th>KiCad 8<\/th><th>Altium Tasar\u0131mc\u0131<\/th><th>Cadence Allegro<\/th><\/tr><\/thead><tbody><tr><td><strong>Temel DRC<\/strong><\/td><td>Tamamland\u0131<\/td><td>M\u00fckemmel<\/td><td>M\u00fckemmel<\/td><\/tr><tr><td><strong>Y\u00fcksek H\u0131z Kurallar\u0131<\/strong><\/td><td>\u26a0\ufe0f Limited<\/td><td>Zengin<\/td><td>\u2705 End\u00fcstri Lideri<\/td><\/tr><tr><td><strong>\u00dcretim Kurallar\u0131<\/strong><\/td><td>\u0130yi<\/td><td>M\u00fckemmel<\/td><td>M\u00fckemmel<\/td><\/tr><tr><td><strong>\u00d6zel Kurallar<\/strong><\/td><td>\u2705 Komut dosyas\u0131 deste\u011fi<\/td><td>\u2705 Ko\u015fullu kurallar<\/td><td>G\u00fc\u00e7l\u00fc<\/td><\/tr><tr><td><strong>\u00d6\u011frenme E\u011frisi<\/strong><\/td><td>Nazik<\/td><td>Orta d\u00fczeyde<\/td><td>Dik<\/td><\/tr><tr><td><strong>Maliyet<\/strong><\/td><td>\u00dccretsiz<\/td><td>$3,000+\/y\u0131l<\/td><td>$10,000+\/y\u0131l<\/td><\/tr><tr><td><strong>TOPFAST Uyumlulu\u011fu<\/strong><\/td><td>90%<\/td><td>95%<\/td><td>98%<\/td><\/tr><\/tbody><\/table><\/figure><hr class=\"wp-block-separator has-alpha-channel-opacity\"\/><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"DRC_and_DFM_Collaboration_Beyond_Basic_Checks\"><\/span>DRC ve <a href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/complete-guide-to-pcb-design-for-manufacturability-dfm\/\">DFM<\/a> \u0130\u015fbirli\u011fi: Temel Kontrollerin \u00d6tesinde<span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Complete_Workflow_From_Design_to_Manufacturing\"><\/span>Eksiksiz \u0130\u015f Ak\u0131\u015f\u0131: Tasar\u0131mdan \u00dcretime<span class=\"ez-toc-section-end\"><\/span><\/h3><div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"135\" src=\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/From-Design-to-Manufacturing-1024x135.png\" alt=\"Tasar\u0131mdan \u00dcretime\" class=\"wp-image-4715\" style=\"width:800px\" srcset=\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/From-Design-to-Manufacturing-1024x135.png 1024w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/From-Design-to-Manufacturing-300x39.png 300w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/From-Design-to-Manufacturing-768x101.png 768w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/From-Design-to-Manufacturing-1536x202.png 1536w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/From-Design-to-Manufacturing-2048x269.png 2048w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/From-Design-to-Manufacturing-18x2.png 18w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/From-Design-to-Manufacturing-600x79.png 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"DRCDFM_Joint_Inspection_Checklist\"><\/span>DRC+DFM Ortak Denetim Kontrol Listesi<span class=\"ez-toc-section-end\"><\/span><\/h3><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Basic_Manufacturing_Checks_TOPFAST_Recommendations\"><\/span>Temel \u00dcretim Kontrolleri (TOPFAST Tavsiyeleri)<span class=\"ez-toc-section-end\"><\/span><\/h4><ul class=\"wp-block-list\"><li><strong>Minimum \u0130z Geni\u015fli\u011fi:<\/strong> \u22650,15 mm (d\u0131\u015f katmanlar), \u22650,13 mm (i\u00e7 katmanlar)<\/li>\n\n<li><strong>Minimum A\u00e7\u0131kl\u0131k:<\/strong> \u22650,15 mm (d\u0131\u015f katmanlar), \u22650,13 mm (i\u00e7 katmanlar)<\/li>\n\n<li><strong>Matkap Boyutu:<\/strong> Mekanik delme \u22650,2 mm, lazer delme \u22650,1 mm<\/li>\n\n<li><strong>Dairesel Halka:<\/strong> \u22650,1 mm (IPC S\u0131n\u0131f 2), \u22650,15 mm (IPC S\u0131n\u0131f 3)<\/li>\n\n<li><strong>Pano Kenar A\u00e7\u0131kl\u0131\u011f\u0131:<\/strong> \u22650,8 mm (V kesimli), \u22651,0 mm (frezelenmi\u015f kenar)<\/li><\/ul><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Advanced_Manufacturing_Checks\"><\/span>Geli\u015fmi\u015f \u00dcretim Kontrolleri<span class=\"ez-toc-section-end\"><\/span><\/h4><ul class=\"wp-block-list\"><li><strong>Lehim Maskesi K\u00f6pr\u00fcs\u00fc:<\/strong> \u22650,08 mm (LPI lehim maskesi)<\/li>\n\n<li><strong>Serigrafi Berrakl\u0131k:<\/strong> \u00c7izgi geni\u015fli\u011fi \u22650,15 mm, y\u00fckseklik \u22651,0 mm<\/li>\n\n<li><strong>Bak\u0131r Kal\u0131nl\u0131\u011f\u0131 E\u015fle\u015ftirme:<\/strong> Mevcut ta\u015f\u0131ma kapasitesini g\u00f6z \u00f6n\u00fcnde bulundurun<\/li>\n\n<li><strong>Termal Tasar\u0131m:<\/strong> Termal yollar, bak\u0131r dengesi<\/li>\n\n<li><strong>Empedans Kontrol\u00fc:<\/strong> \u0130stifleme onay\u0131 sa\u011flay\u0131n<\/li><\/ul><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Common_DRC_Problems_and_Solutions\"><\/span>Yayg\u0131n DRC Sorunlar\u0131 ve \u00c7\u00f6z\u00fcmleri<span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"TOPFAST_Engineer_Practical_Case_Library\"><\/span>TOPFAST M\u00fchendis Pratik Vaka K\u00fct\u00fcphanesi<span class=\"ez-toc-section-end\"><\/span><\/h3><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Case_1_False_Short-Circuit_Alarms\"><\/span>Vaka 1: Yanl\u0131\u015f K\u0131sa Devre Alarmlar\u0131<span class=\"ez-toc-section-end\"><\/span><\/h4><p><strong>Problem Fenomeni:<\/strong> DRC yayg\u0131n k\u0131sa devreler oldu\u011funu bildiriyor, ancak ger\u00e7ek bir elektrik ba\u011flant\u0131s\u0131 yok<br><strong>K\u00f6k neden:<\/strong> Bak\u0131r b\u00f6lgeleri do\u011fru \u015fekilde doldurulmad\u0131 ve g\u00fcncellenmedi<br><strong>\u00c7\u00f6z\u00fcm:<\/strong><\/p><ol class=\"wp-block-list\"><li>T\u00fcm bak\u0131r b\u00f6lgeleri yeniden doldurun<\/li>\n\n<li>Otomatik dolum g\u00fcncellemelerini ayarlama<\/li>\n\n<li>Dolgu parametrelerini do\u011frulay\u0131n (izolasyon aral\u0131\u011f\u0131, dolgu modu)<\/li><\/ol><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Case_2_Impedance_Matching_Failure\"><\/span>Vaka 2: Empedans E\u015fle\u015ftirme Hatas\u0131<span class=\"ez-toc-section-end\"><\/span><\/h4><p><strong>Problem Fenomeni:<\/strong> Y\u00fcksek h\u0131zl\u0131 sinyal empedans\u0131 \u00b110% tolerans\u0131n\u0131 a\u015f\u0131yor<br><strong>K\u00f6k neden:<\/strong> Hatal\u0131 y\u0131\u011f\u0131n yap\u0131s\u0131 parametreleri<br><strong>\u00c7\u00f6z\u00fcm:<\/strong><\/p><ol class=\"wp-block-list\"><li>TOPFAST empedans hesaplay\u0131c\u0131s\u0131n\u0131 kullanarak do\u011frulay\u0131n<\/li>\n\n<li>\u0130z geni\u015fli\u011fini\/a\u00e7\u0131kl\u0131\u011f\u0131n\u0131 ayarlama<\/li>\n\n<li>Dielektrik kal\u0131nl\u0131\u011f\u0131n\u0131 ve sabitini teyit edin<\/li><\/ol><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Case_3_Manufacturing_Rule_Conflicts\"><\/span>Vaka 3: \u00dcretim Kural\u0131 \u00c7at\u0131\u015fmalar\u0131<span class=\"ez-toc-section-end\"><\/span><\/h4><p><strong>Problem Fenomeni:<\/strong> Tasar\u0131m DRC'den ge\u00e7iyor, ancak \u00fcretici reddediyor<br><strong>K\u00f6k neden:<\/strong> DRC kurallar\u0131 en son \u00fcretim kabiliyetlerine g\u00f6re g\u00fcncellenmemi\u015ftir<br><strong>\u00c7\u00f6z\u00fcm:<\/strong><\/p><ol class=\"wp-block-list\"><li>TOPFAST'\u0131n en son DRC kural dosyalar\u0131n\u0131 i\u00e7e aktar\u0131n<\/li>\n\n<li>\u00dcretim \u00f6n incelemesi ger\u00e7ekle\u015ftirin<\/li>\n\n<li>Tasar\u0131m parametrelerini ayarlay\u0131n<\/li><\/ol><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"TOPFAST_Customer_Success_Cases\"><\/span>TOPFAST M\u00fc\u015fteri Ba\u015far\u0131 \u00d6rnekleri<span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Case_Industrial_Control_Motherboard\"><\/span>Kasa: End\u00fcstriyel Kontrol Anakart\u0131<span class=\"ez-toc-section-end\"><\/span><\/h3><p><strong>Meydan okuma:<\/strong> \u0130lk pano imalat\u0131 ba\u015far\u0131s\u0131z oldu, ciddi k\u0131sa devre sorunlar\u0131<br><strong>\u00c7\u00f6z\u00fcm:<\/strong><\/p><ol class=\"wp-block-list\"><li>\u0130\u00e7e aktar\u0131lan TOPFAST DRC kural dosyalar\u0131<\/li>\n\n<li>215 DRC ihlali d\u00fczeltildi<\/li>\n\n<li>\u00dcretim \u00f6n incelemesi ger\u00e7ekle\u015ftirildi<\/li>\n\n<li>Optimize edilmi\u015f termal tasar\u0131m<\/li><\/ol><p><strong>Sonu\u00e7lar:<\/strong><\/p><ul class=\"wp-block-list\"><li>Kurul ba\u015far\u0131 oran\u0131: <strong>100%<\/strong><\/li>\n\n<li>Maliyet tasarrufu: <strong>$12,500<\/strong><\/li>\n\n<li>Geli\u015ftirme d\u00f6ng\u00fcs\u00fc k\u0131sald\u0131: <strong>4 hafta<\/strong><\/li>\n\n<li>\u00dcr\u00fcn g\u00fcvenilirli\u011finin iyile\u015ftirilmesi: <strong>MTBF 30% ile art\u0131r\u0131ld\u0131<\/strong><\/li><\/ul><div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"402\" src=\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-3.jpg\" alt=\"PCB Tasar\u0131m DRC\" class=\"wp-image-4717\" srcset=\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-3.jpg 600w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-3-300x201.jpg 300w, https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-3-18x12.jpg 18w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure><\/div><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Conclusion_Master_DRC_Master_the_Key_to_Success\"><\/span>Sonu\u00e7: DRC'de Ustala\u015f\u0131n, Ba\u015far\u0131n\u0131n Anahtar\u0131nda Ustala\u015f\u0131n<span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Action_Steps\"><\/span>\u00d6nemli Eylem Ad\u0131mlar\u0131<span class=\"ez-toc-section-end\"><\/span><\/h3><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Immediate_Actions_Complete_Today\"><\/span>Acil Eylemler (Bug\u00fcn Tamamlay\u0131n)<span class=\"ez-toc-section-end\"><\/span><\/h4><ol class=\"wp-block-list\"><li><strong>TOPFAST kural dosyalar\u0131n\u0131 indirin:<\/strong> \u00dcretim kabiliyetlerini e\u015fle\u015ftirin<\/li>\n\n<li><strong>Tam bir DRC incelemesi ger\u00e7ekle\u015ftirin:<\/strong> Bu k\u0131lavuzu kullanma<\/li>\n\n<li><strong>Kritik ihlalleri d\u00fczeltin:<\/strong> \u00dcretimle ilgili konulara \u00f6ncelik verin<\/li><\/ol><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Short-term_Optimisation_Complete_This_Week\"><\/span>K\u0131sa Vadeli Optimizasyon (Bu Hafta Tamamlanacak)<span class=\"ez-toc-section-end\"><\/span><\/h4><ol class=\"wp-block-list\"><li><strong>Denetim s\u00fcrecini olu\u015fturun:<\/strong> DRC kontrol noktalar\u0131n\u0131 standartla\u015ft\u0131r\u0131n<\/li>\n\n<li><strong>Tak\u0131m e\u011fitimi:<\/strong> En iyi uygulamalar\u0131 payla\u015f\u0131n<\/li>\n\n<li><strong>\u00dcretici ni\u015fan\u0131:<\/strong> TOPFAST teknik ekibi ile ileti\u015fim kurmak<\/li><\/ol><h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Long-term_Strategy_Complete_This_Month\"><\/span>Uzun Vadeli Strateji (Bu Ay Tamamlay\u0131n)<span class=\"ez-toc-section-end\"><\/span><\/h4><ol class=\"wp-block-list\"><li><strong>S\u00fcre\u00e7 otomasyonu:<\/strong> Komut dosyas\u0131 tabanl\u0131 toplu denetim<\/li>\n\n<li><strong>Bilgi taban\u0131 geli\u015ftirme:<\/strong> Problem \u00e7\u00f6z\u00fcmlerini biriktirin<\/li>\n\n<li><strong>S\u00fcrekli iyile\u015ftirme:<\/strong> \u00dc\u00e7 ayl\u0131k kural g\u00fcncellemeleri<\/li><\/ol><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Professional_Advice\"><\/span>Profesyonel Tavsiye<span class=\"ez-toc-section-end\"><\/span><\/h3><ol class=\"wp-block-list\"><li><strong>Varsay\u0131lan kurallara g\u00fcvenmeyin:<\/strong> \u00dcretici yetenekleri b\u00fcy\u00fck farkl\u0131l\u0131klar g\u00f6sterir<\/li>\n\n<li><strong>Erken kontrol edin, s\u0131k s\u0131k kontrol edin:<\/strong> Her tasar\u0131m a\u015famas\u0131nda DRC<\/li>\n\n<li><strong>\u00dcreticilerle i\u015fbirli\u011fi yap\u0131n:<\/strong> TOPFAST \u00fccretsiz \u00f6n inceleme sunuyor<\/li>\n\n<li><strong>Alet e\u011fitimine yat\u0131r\u0131m yap\u0131n:<\/strong> Geli\u015fmi\u015f \u00f6zelliklerde uzmanla\u015f\u0131n<\/li>\n\n<li><strong>Kalite k\u00fclt\u00fcr\u00fc olu\u015fturun:<\/strong> DRC bir ekip sorumlulu\u011fudur<\/li><\/ol><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Expert_Q_A\"><\/span>Uzman Soru-Cevap<span class=\"ez-toc-section-end\"><\/span><\/h2><p><strong>DRC denetimi ne s\u0131kl\u0131kta yap\u0131lmal\u0131d\u0131r?<\/strong><\/p><p><strong>En \u0130yi Uygulamalar:<\/strong><\/p><ul class=\"wp-block-list\"><li><strong>Ger\u00e7ek zamanl\u0131 kontrol:<\/strong> Yerle\u015fim ve y\u00f6nlendirme s\u0131ras\u0131nda \u00e7evrimi\u00e7i DRC'yi etkinle\u015ftirin<\/li>\n\n<li><strong>Sahne kontrol\u00fc:<\/strong> Her tasar\u0131m kilometre ta\u015f\u0131ndan sonra toplu DRC<\/li>\n\n<li><strong>Son kontrol:<\/strong> \u00dcretim i\u00e7in g\u00f6ndermeden \u00f6nce DRC'yi tamamlay\u0131n<\/li>\n\n<li><strong>\u00d6nerilen s\u0131kl\u0131k:<\/strong> G\u00fcnde en az bir tam kontrol<\/li><\/ul><p>TOPFAST verileri: G\u00fcnl\u00fck olarak kontrol edilen projeler sorunlar\u0131 68% oran\u0131nda azaltmaktad\u0131r.<br><br><strong>\u00dc\u00e7 ara\u00e7 aras\u0131ndan nas\u0131l se\u00e7im yap\u0131l\u0131r?<\/strong><\/p><p><strong>Se\u00e7im K\u0131lavuzu:<\/strong><\/p><ul class=\"wp-block-list\"><li><strong>Yeni ba\u015flayanlar\/K\u00fc\u00e7\u00fck projeler:<\/strong> KiCad (\u00fccretsiz, \u00f6\u011frenmesi kolay)<\/li>\n\n<li><strong>K\u00fc\u00e7\u00fck-orta \u00f6l\u00e7ekli i\u015fletmeler:<\/strong> Altium (uygun maliyetli, zengin \u00f6zellikli)<\/li>\n\n<li><strong>Karma\u015f\u0131k\/Y\u00fcksek frekansl\u0131 tasar\u0131mlar:<\/strong> Cadence Allegro (end\u00fcstri k\u0131yaslamas\u0131)<\/li>\n\n<li><strong>Dikkate al\u0131nmas\u0131 gereken fakt\u00f6rler:<\/strong> B\u00fct\u00e7e, ekip becerileri, proje karma\u015f\u0131kl\u0131\u011f\u0131, \u00fcretici deste\u011fi<\/li><\/ul><p>TOPFAST, her \u00fc\u00e7 ara\u00e7 i\u00e7in de kapsaml\u0131 teknik destek sa\u011flamaktad\u0131r.<br><br><strong>TOPFAST DRC \u00f6n incelemesi i\u00e7in ne gereklidir?<\/strong><\/p><p><strong>Ba\u015fvuru materyalleri:<\/strong><\/p><ol class=\"wp-block-list\"><li>PCB tasar\u0131m dosyalar\u0131 (Gerber 274X)<\/li>\n\n<li>Matkap dosyalar\u0131 (Excellon format\u0131)<\/li>\n\n<li>Netlist dosyalar\u0131<\/li>\n\n<li>Y\u0131\u011f\u0131n yap\u0131s\u0131 a\u00e7\u0131klamas\u0131<\/li>\n\n<li>\u00d6zel gereksinim belgeleri<\/li><\/ol><p><strong>Hizmet \u00f6zellikleri:<\/strong><\/p><ul class=\"wp-block-list\"><li><strong>\u00dccretsiz servis:<\/strong> T\u00fcm TOPFAST m\u00fc\u015fterileri i\u00e7in<\/li>\n\n<li><strong>24 saat geri bildirim:<\/strong> H\u0131zl\u0131 yan\u0131t<\/li>\n\n<li><strong>Detayl\u0131 raporlar:<\/strong> Onar\u0131m \u00f6nerilerini dahil edin<\/li>\n\n<li><strong>Teknik destek:<\/strong> Bire bir m\u00fchendis yard\u0131m\u0131<br><\/li><\/ul><h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Get_Professional_Support\"><\/span>Profesyonel Destek Al\u0131n<span class=\"ez-toc-section-end\"><\/span><\/h2><h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"TOPFAST_Technical_Services\"><\/span>TOPFAST Teknik Hizmetler<span class=\"ez-toc-section-end\"><\/span><\/h3><ul class=\"wp-block-list\"><li><strong>DRC kural \u00f6zelle\u015ftirmesi:<\/strong> Proje ihtiya\u00e7lar\u0131na g\u00f6re uyarlanm\u0131\u015f<\/li>\n\n<li><strong>\u00dcretim \u00f6n incelemesi:<\/strong> \u00dccretsiz profesyonel de\u011ferlendirme<\/li>\n\n<li><strong>Teknik e\u011fitim:<\/strong> Ekip becerilerinin geli\u015ftirilmesi<\/li>\n\n<li><strong>Tasar\u0131m optimizasyonu:<\/strong> Performans ve maliyeti dengeleyin<\/li><\/ul><p><\/p>","protected":false},"excerpt":{"rendered":"<p>Bu k\u0131lavuz, KiCad 8, Altium Designer ve Cadence Allegro i\u015f ak\u0131\u015flar\u0131n\u0131 kapsayan PCB Tasar\u0131m Kural Kontrol\u00fcn\u00fc (DRC) detayland\u0131rmaktad\u0131r. DRC'nin ilk seferde kart ba\u015far\u0131s\u0131n\u0131 40%+ oran\u0131nda nas\u0131l art\u0131rd\u0131\u011f\u0131n\u0131 ve yeniden i\u015fleme maliyetlerini 60%+ oran\u0131nda nas\u0131l azaltt\u0131\u011f\u0131n\u0131 \u00f6\u011frenin. TOPFAST'\u0131n kural dosyalar\u0131na ve \u00fccretsiz \u00fcretim \u00f6n incelemesine eri\u015fin. Tasar\u0131mdan \u00fcretime sorunsuz entegrasyon i\u00e7in DRC tekniklerinde uzmanla\u015f\u0131n.<\/p>","protected":false},"author":1,"featured_media":4718,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[108],"tags":[414],"class_list":["post-4713","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-drc-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>PCB Design DRC Inspection Complete Guide: Avoid 90% of Manufacturing Pitfalls - Topfastpcb<\/title>\n<meta name=\"description\" content=\"Master PCB DRC: KiCad, Altium &amp; Allegro step-by-step guides. Increase board success 40%+ with TOPFAST rule files. Avoid 90% manufacturing defects. Free pre-review ensures first-time success.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PCB Design DRC Inspection Complete Guide: Avoid 90% of Manufacturing Pitfalls - Topfastpcb\" \/>\n<meta property=\"og:description\" content=\"Master PCB DRC: KiCad, Altium &amp; Allegro step-by-step guides. Increase board success 40%+ with TOPFAST rule files. Avoid 90% manufacturing defects. Free pre-review ensures first-time success.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/\" \/>\n<meta property=\"og:site_name\" content=\"Topfastpcb\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-02T00:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"402\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u6258\u666e\u6cd5\u65af\u7279\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u6258\u666e\u6cd5\u65af\u7279\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/\"},\"author\":{\"name\":\"\u6258\u666e\u6cd5\u65af\u7279\",\"@id\":\"https:\/\/www.topfastpcb.com\/#\/schema\/person\/39870874f1c329f3cd3693593dbdce3a\"},\"headline\":\"PCB Design DRC Inspection Complete Guide: Avoid 90% of Manufacturing Pitfalls\",\"datePublished\":\"2025-12-02T00:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/\"},\"wordCount\":1068,\"publisher\":{\"@id\":\"https:\/\/www.topfastpcb.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-2.jpg\",\"keywords\":[\"DRC\"],\"articleSection\":[\"News\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/\",\"url\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/\",\"name\":\"PCB Design DRC Inspection Complete Guide: Avoid 90% of Manufacturing Pitfalls - Topfastpcb\",\"isPartOf\":{\"@id\":\"https:\/\/www.topfastpcb.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-2.jpg\",\"datePublished\":\"2025-12-02T00:00:00+00:00\",\"description\":\"Master PCB DRC: KiCad, Altium & Allegro step-by-step guides. Increase board success 40%+ with TOPFAST rule files. Avoid 90% manufacturing defects. Free pre-review ensures first-time success.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#primaryimage\",\"url\":\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-2.jpg\",\"contentUrl\":\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-2.jpg\",\"width\":600,\"height\":402,\"caption\":\"PCB Design DRC\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\/\/www.topfastpcb.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PCB Design DRC Inspection Complete Guide: Avoid 90% of Manufacturing Pitfalls\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.topfastpcb.com\/#website\",\"url\":\"https:\/\/www.topfastpcb.com\/\",\"name\":\"Topfastpcb\",\"description\":\"Topfast Prime Choice for Global Electronics Manufacturing\",\"publisher\":{\"@id\":\"https:\/\/www.topfastpcb.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.topfastpcb.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.topfastpcb.com\/#organization\",\"name\":\"Topfastpcb\",\"url\":\"https:\/\/www.topfastpcb.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\/\/www.topfastpcb.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2026\/02\/cropped-topfast-logo.png\",\"contentUrl\":\"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2026\/02\/cropped-topfast-logo.png\",\"width\":144,\"height\":56,\"caption\":\"Topfastpcb\"},\"image\":{\"@id\":\"https:\/\/www.topfastpcb.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.topfastpcb.com\/#\/schema\/person\/39870874f1c329f3cd3693593dbdce3a\",\"name\":\"\u6258\u666e\u6cd5\u65af\u7279\",\"sameAs\":[\"http:\/\/www.topfastpcb.com\"],\"url\":\"https:\/\/www.topfastpcb.com\/tr\/blog\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PCB Design DRC Inspection Complete Guide: Avoid 90% of Manufacturing Pitfalls - Topfastpcb","description":"Master PCB DRC: KiCad, Altium & Allegro step-by-step guides. Increase board success 40%+ with TOPFAST rule files. Avoid 90% manufacturing defects. Free pre-review ensures first-time success.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/","og_locale":"tr_TR","og_type":"article","og_title":"PCB Design DRC Inspection Complete Guide: Avoid 90% of Manufacturing Pitfalls - Topfastpcb","og_description":"Master PCB DRC: KiCad, Altium & Allegro step-by-step guides. Increase board success 40%+ with TOPFAST rule files. Avoid 90% manufacturing defects. Free pre-review ensures first-time success.","og_url":"https:\/\/www.topfastpcb.com\/tr\/blog\/pcb-design-drc-inspection-complete-guide\/","og_site_name":"Topfastpcb","article_published_time":"2025-12-02T00:00:00+00:00","og_image":[{"width":600,"height":402,"url":"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-2.jpg","type":"image\/jpeg"}],"author":"\u6258\u666e\u6cd5\u65af\u7279","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"\u6258\u666e\u6cd5\u65af\u7279","Tahmini okuma s\u00fcresi":"6 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#article","isPartOf":{"@id":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/"},"author":{"name":"\u6258\u666e\u6cd5\u65af\u7279","@id":"https:\/\/www.topfastpcb.com\/#\/schema\/person\/39870874f1c329f3cd3693593dbdce3a"},"headline":"PCB Design DRC Inspection Complete Guide: Avoid 90% of Manufacturing Pitfalls","datePublished":"2025-12-02T00:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/"},"wordCount":1068,"publisher":{"@id":"https:\/\/www.topfastpcb.com\/#organization"},"image":{"@id":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-2.jpg","keywords":["DRC"],"articleSection":["News"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/","url":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/","name":"PCB Design DRC Inspection Complete Guide: Avoid 90% of Manufacturing Pitfalls - Topfastpcb","isPartOf":{"@id":"https:\/\/www.topfastpcb.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#primaryimage"},"image":{"@id":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#primaryimage"},"thumbnailUrl":"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-2.jpg","datePublished":"2025-12-02T00:00:00+00:00","description":"Master PCB DRC: KiCad, Altium & Allegro step-by-step guides. Increase board success 40%+ with TOPFAST rule files. Avoid 90% manufacturing defects. Free pre-review ensures first-time success.","breadcrumb":{"@id":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#primaryimage","url":"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-2.jpg","contentUrl":"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2025\/12\/PCB-Design-DRC-2.jpg","width":600,"height":402,"caption":"PCB Design DRC"},{"@type":"BreadcrumbList","@id":"https:\/\/www.topfastpcb.com\/blog\/pcb-design-drc-inspection-complete-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.topfastpcb.com\/"},{"@type":"ListItem","position":2,"name":"PCB Design DRC Inspection Complete Guide: Avoid 90% of Manufacturing Pitfalls"}]},{"@type":"WebSite","@id":"https:\/\/www.topfastpcb.com\/#website","url":"https:\/\/www.topfastpcb.com\/","name":"Topfastpcb","description":"Topfast Prime Choice for Global Electronics Manufacturing","publisher":{"@id":"https:\/\/www.topfastpcb.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.topfastpcb.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/www.topfastpcb.com\/#organization","name":"Topfastpcb","url":"https:\/\/www.topfastpcb.com\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.topfastpcb.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2026\/02\/cropped-topfast-logo.png","contentUrl":"https:\/\/www.topfastpcb.com\/wp-content\/uploads\/2026\/02\/cropped-topfast-logo.png","width":144,"height":56,"caption":"Topfastpcb"},"image":{"@id":"https:\/\/www.topfastpcb.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.topfastpcb.com\/#\/schema\/person\/39870874f1c329f3cd3693593dbdce3a","name":"\u6258\u666e\u6cd5\u65af\u7279","sameAs":["http:\/\/www.topfastpcb.com"],"url":"https:\/\/www.topfastpcb.com\/tr\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/posts\/4713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/comments?post=4713"}],"version-history":[{"count":1,"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/posts\/4713\/revisions"}],"predecessor-version":[{"id":4719,"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/posts\/4713\/revisions\/4719"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/media\/4718"}],"wp:attachment":[{"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/media?parent=4713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/categories?post=4713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.topfastpcb.com\/tr\/wp-json\/wp\/v2\/tags?post=4713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}