Precision-engineered solutions for next-generation electronics
Comprehensive range of electronic components
Where our components make an impact
AEC-Q200 qualified components for EV systems and ADAS
Robust components for harsh environment applications
Miniaturized solutions for portable electronics
High-reliability components for critical systems
Innovations driving component development
SiC and GaN components enabling high-efficiency power conversion in EV and renewable energy systems
Advanced packaging technologies for higher density and improved thermal performance
Embedded sensors and wireless connectivity for smart monitoring and predictive maintenance
Our component specialists are ready to support your engineering challenges
We adopt a flexible MOQ policy: we support 3-5pcs MOQ for standard models to meet R&D needs, 5% discount for small quantity orders (50-100pcs), and up to 15% step discount for large quantity orders (above 1000pcs). MOQ for special package or customized materials need to be confirmed separately.
We provide diversified settlement plans: new customers support T/T prepayment of 30%, and after 3 times of cooperation, we can apply for 50% prepayment + 50% on delivery; quality customers can be open to monthly settlement of 30-60 days after evaluation.
All shipped materials retain complete original packaging information: including but not limited to original labels, lot numbers, MSL ratings, RoHS test reports. For bulk materials, we provide secondary vacuum packaging with test certificates.
We provide professional material substitution management service: Customers are required to provide a written confirmation letter for substitution, and we will verify the compatibility of parameters and issue an evaluation report. At the same time, we will mark the BOM change records to ensure traceability.
We provide full-process customization services from design to mass production: Parameter customization: We support personalized adjustment of electrical characteristics, package size, etc. Sample Trial Production: Engineering samples can be provided in 2 weeks at the earliest. Small batch validation: Starting from 50-100pcs, complete test report will be provided. Mass production guarantee: establish exclusive production line and quality control standards.
We have established a four-fold environmental protection mechanism: Raw material control: Require suppliers to provide the latest RoHS/REACH test report. Incoming material inspection: XRF screening for hazardous substances for each batch. Process control: Lead-free production lines operate independently to avoid cross contamination. Documentation Traceability: Maintain a complete chain of documents proving environmental compliance.
PCB FabricationPCB AssemblyOther
Δ